THE WEEK OF MARCH 15 2010

 

 

MUNICIPAL MANAGERS/PUBLIC WORKS LUNCHEON SET FOR MARCH 30

 

The Partnership TMA invites municipal managers and their administrative assistants and public works directors for a complimentary luncheon on Tuesday, March 30 at noon.  The meeting, held at The William Penn Inn, will update our member townships and boroughs on recent developments with the TMA. 

 

Also, Ed Burns, a construction supervisor at PennDOT will give a recap of roadwork and bridge projects slated for 2010.

 

RSVP to 215-699-2733 or info@ptma-mc.org

 

 

 

TIPS OF THE WEEK

 

 

·        Beginning March 15, PennDOT will extend the express lane traffic pattern on I-476 moving one lane of southbound traffic to the opposite side of the highway from the Mid-County interchange to the I-76 interchange.  The switch is expected for two years.

 

·        From March 15 – 17, westbound I-76 will be reduced to one lane between Gulph Mills and Route 202 for the installation of concrete barrier between 10:00pm and 5:00am. 

 

·        From March 17 – June 15, Rockledge Borough will reduce Route 232 to one lane between Central Avenue and Shady Lane for extensive streetscape renovations weekdays between 9:00am to 3:00pm.

 

·        PennDOT advises motorists of the dangers of driving while sleepy.  Daylight Savings Time resulted in an hour “lost” for local residents.  In a five-year period ending in 2009, there were 11,385 crashes and 110 fatalities involving fatigued drivers statewide.  The peak hours for drowsy driving are 6:00am to 8:00am. 

 

·        Beginning March 19, Fretz Road will be closed and detoured between Wambold Road and Tomlinson Road in Lower Salford, Towamencin and Hatfield Twps for Route 309 Connector work through May 7.   

 

The following is more detailed information on roadwork in Philadelphia and Montgomery Counties followed by information on Route 309.   If you would like information on other counties, please email us at mobilitymanager@ptma-mc.org

 

Information can also be sent to your cell phone or Blackberry.

 

PHILADELPHIA

 

 

PA 291 (Platt Bridge) East

Bridge Inspection: RIGHT LANE CLOSED between Lanier Ave. & Bartrum Ave.  6 AM - 10 AM.

3/14/10

*US 1 North

Concrete Barrier Placement: ONE LANE CLOSED on Northbound twin bridge over Schuylkill River.  9 PM - 5 AM.

3/15/10

*US 1 South 

Bridge Work:  ONE LANE CLOSED on Southbound twin bridge over Schuylkill River.  9 AM - 3 PM & 9 PM - 5 AM.

3/15/10-3/16/10

*I-95 N & S

Bridge Work: LANE RESTRICTIONS between Girard Ave. & Woodhaven rds.  9 AM - 4 PM.

3/15/10-3/19/10

Tacony St.

Bridge Work: LANE RESTRICTIONS between Bridge St. & Aramingo Ave.  7 AM - 5 PM.

3/15/10-3/19/10

Front St.

Bridge Work: LANE RESTRICTIONS between Packer Ave. & Oregon Ave.  7 AM - 5 PM.

3/15/10-3/19/10

*US 1 (Roosevelt Extension)            N & S

Sweeping/Drain Cleaning: LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 3:00 PM. 

3/15/10-3/19/10

*I-676 E & W

Sweeping/Drain Cleaning: SHOULDER CLOSURES between I-76 & I-95.  9:30 AM - 3:00 PM.

3/15/10-3/19/10

*I-95 N & S                                        

Sweeping/Drain Cleaning:  SHOULDER CLOSURES between PA 63 (Woodhaven Rd.) & Phila. Intl. Airport.  9:30 AM - 3:00 PM.

3/15/10-3/19/10

*I-76 E & W

Sweeping/Drain Cleaning:  SHOULDER CLOSURES between City Ave. & 26th St.  9:30 AM - 3:00 PM.

3/15/10-3/19/10

*US 1 N & S

Line Painting: ONE LANE CLOSED on twin bridges over Schuylkill.  9 PM - 5 AM.

3/16/10

Neill Drive East

Bridge Inspection: LANE CLOSURE between Falls Rd. & Martin Luther King Drive.  8 AM - 12 PM.

3/16/10

Neill Drive West

Bridge Inspection: LANE CLOSURE between Martin Luther King Drive & Falls Rd.  12 PM - 4 PM.

3/16/10

US 1 (Roosevelt Boulevard) North

Bridge Inspection: LEFT INNER LANE CLOSED between St. Vincent St. & Bleigh Ave.  9 AM - 11 AM.

3/16/10

US 1 (Roosevelt Boulevard) North

Bridge Inspection: RIGHT INNER LANE CLOSED between St. Vincent St. & Bleigh Ave.  11 AM - 1 PM.

3/16/10

US 1 (Roosevelt Boulevard) South

Bridge Inspection: RIGHT INNER LANE CLOSED between St. Vincent St. & Bleigh Ave.  1 PM - 3 PM.

3/16/10

Broad St. South Ramp to I-95

Bridge Inspection: RIGHT SHOULDER CLOSED on ramp.  9 AM - 12 PM.

3/17/10

*I-95 North ramp to Broad St. North

Bridge Inspection: RIGHT SHOULDER CLOSED on ramp.  12 PM - 3 PM.

3/17/10

Cottman Ave. (PA 73)

Concrete Barrier Placement: INTERMITTENT 15 MINUTE TRAFFIC STOPPAGES between State Rd. & Keystone St.  7 PM - 6 AM.

3/17/10

*US 1 North

Bridge Work:  ONE LANE CLOSED on Northbound twin bridge over Schuylkill River.  9 AM - 3 PM & 9 PM - 5 AM.

3/17/10-3/20/10

Henry Ave. Bridge North

Concrete Barrier Installation:  REDUCED TO ONE LANE on bridge.  9 AM - 3 PM.

3/17/10-8/31/10

*I-76 East

Sign Structure Installation: REDUCED TO ONE LANE at South St. Interchange.  INTERMITTENT 15-MIN. STOPPAGES 12:01 AM - 5 AM.

3/22/10-3/23/10

Ashburner St.

Expansion Dam & Abutment Backwall Replacement: WESTBOUND LANE CLOSED between State Rd. & Torresdale Ave.  24-HOUR RESTRICTION.

3/29/10-7/2010

City Ave. South Ramp to Ridge Pike West

Bridge Replacement: RAMPS CLOSED & DETOURED.  24-HOUR DETOUR.

3/11/10-12/2010

Northbound City Ave. Ramp to Northbound Ridge Ave.

Bridge Replacement: RAMP CLOSED & DETOURED.  24-HOUR DETOUR.  DETOUR POSTED.

3/11/10-2011

Princeton Ave.

Utility Work: RAMP CLOSED at State Rd.  7 PM - 6 AM.

3/12/10-3/13/10

PA 291 East (Penrose Ave.)

Bridge Inspection: RIGHT LANE CLOSED between Lanier Ave. & Bartram Ave.   8 AM - 12 PM.

3/13/09

PA 291 West (Penrose Ave.)

Bridge Inspection: RIGHT LANE CLOSED between Lanier Ave. & Bartram Ave.  12 PM - 4 PM.

3/13/10

Washington Lane

ADA Ramp Construction: LANE RESTRICTIONS between Cheltenham Ave. & Gilbert St.  7 AM - 4 PM.

3/15/10-3/19/10

*US 1 N & S

Bridge Work: LEFT LANE CLOSED on twin bridges over Schuylkill River.  9 AM - 3 PM.

3/1/10-2/2011

State Rd.

Utility Installation: LANE RESTRICTIONS between Pearson Ave. & Fitler St. 24-HOUR RESTRICTIONS.

2/8/09-7/31/10

State Rd.

Utility Installation: LANE RESTRICTIONS between Ashburner St. & Linden Ave.  24-HOUR RESTRICTIONS.

12/21/09-4/29/10

*I-95 N & S

Sound Wall Installation: RIGHT SHOULDER CLOSED between Washington Ave. & I-76.  10 PM - 5 AM.

9/8/09-3/2010

*I-95 N & S

Bridge Construction: TRAFFIC PATTERN SHIFT between Broad St. Interchange & Girard Point Bridge. 

8/3/09-12/2010

*I-95 North ramp to Cottman Ave.

Construction: RAMP REDUCED FROM TWO LANES TO ONE. 24-HOUR RESTRICTION.

7/13/09-8/2010

Cottman Ave. (PA 73)

Utility Installation/Reconstruction: REDUCED TWO LANES TO ONE between State Rd. & Torresdale Ave.  24-HOUR RESTRICTION.

7/13/09-8/2010

*I-95 South

Ramp Construction: REDUCED FROM FOUR LANES TO THREE at PA 73 (Cottman Ave.) interchange.  24-HOUR RESTRICTION.

6/17/09-3/2011

Henry Ave.

Bridge Repair: LANE RESTRICTIONS between Gates St. & Valley Ave.  24-HOUR.

6/2/09-8/2/2011

Henry Ave.

Bridge Rehabilitation: TRAFFIC PATTERN SHIFT & PARKING RESTRICTIONS on bridge. 

4/6/09-9/2011

PA 611 (North Broad Street)

Traffic Signal Construction: LANE RESTRICTIONS between Clearfield St. & Rising Sun Ave.  9 AM - 3 PM.

1/22/09-2/2010

*I-76 ramps at South St. Interchange

Bridge Replacement:  RAMPS CLOSED & DETOURED.  24-HOUR DETOUR. 

12/8/08-10/2010

South St. Bridge

Bridge Construction: CLOSED & DETOURED between 27th  St. & Convention Ave.  24-HOUR DETOUR.  DETOUR POSTED.

12/8/08-10/2010

 

MONTGOMERY COUNTY

 

 

*I-476 N & S, Lower Merion, Plymouth twps., West Conshohocken Bor.

Road Reconstruction & Bridge Construction:  LANE CLOSURES  between Pennsylvania Turnpike Mid-County Interchange (Exit 20) & I-76 Interchange (Exit 16).  7 PM - 6 AM.  POSSIBLE 15-MIN. TRAFFIC STOPPAGES between 1 AM - 5 AM.

3/14/10-3/19/10

*I-476 South, W. Conshohocken Bor., Plymouth Twp.

Traffic Pattern Shift: SOUTHBOUND TRAFFIC IN NEW THREE-LANE PATTERN between Pennsylvania Turnpike Mid-County Interchange and I-76.  

3/15/10-12/2010

PA 29 North (Bridge St.), Upper Providence Twp.

Bridge Inspection: LANE CLOSURE between Walnut St. & Ashland St.  9 AM - 3 PM.

3/15/10

PA 232, Rockledge Bor.

Utility Work: REDUCED TO ONE LANE between Central Ave. & Shady Lane.  9 AM - 3 PM. 

3/15/10-3/16/10

*I-76 West, Upper Merion Twp.

Setting Temporary Barrier:  RIGHT LANE CLOSED between Gulph Mills exit & Weadley Rd. overpass.   10 PM - 5 AM.

3/15/10-3/17/10

*I-76 E & W, Lower Merion Twp.

Shoulder Sweeping: SLOW MOVING OPERATION between US 1 (City Ave.) & Conshohocken exits.  9:30 AM - 3 PM.

3/15/10-3/18/10

Jenkintown Rd., Upper Dublin Twp.

Signal Installation: LANE RESTRICTIONS between North Hills Ave. & Fitzwatertown Rd.  9 AM - 3 PM.

3/15/10-3/19/10

Bethlehem Pike, Springfield Twp.

Signal Installation: LANE RESTRICTIONS between Wissahickon Ave. & Mill Rd.  9 AM - 3 PM.

3/15/10-3/19/10

PA 463 (Horsham Rd.), Montgomery Twp.

Road Widening: ONE LANE CLOSED between General Hancock Blvd. & North Wales Rd.  7 AM - 5 PM.

3/15/10-3/19/10

*US 422 West, Limerick Twp.

Crack Sealing: LANE RESTRICITONS between Royersford & Linfield/Limerick exits.  9 AM - 3 PM.

3/15/10-3/19/10

*US 422 West, Upper Providence, Limerick twps.

Conduit Installation: LANE CLOSURES between Royersford & PA 29 interchanges.  7 PM - 2 PM. 

3/15/10-3/19/10

*US 422 East, Upper Providence, Limerick twps.

Conduit Installation: LANE CLOSURES between PA 29 & Royersford interchanges.  10 AM - 5 AM.

3/15/20-3/19/10

PA 152 (Limekiln Pike), Abington Twp.

ADA Ramp Construction: LANE RESTRICTIONS at Mt. Carmel Ave.; Willow Grove Ave.; Glenside Ave.; Waverly Rd.; Harrison Ave. & Church Rd.  7 AM - 4 PM.

3/15/10-3/19/10

PA 232, Rockledge Bor.

Streetscape Construction: REDUCED TO ONE LANE between Central Ave. & Shady Lane.  9 AM - 3 PM. 

3/15/10-6/15/10

Pine Rd., Lower Moreland Twp.

Utility Installation: CLOSED AND DETOURED between Philmont Ave., & Byberry Rd. 9 AM - 3 PM.  DETOUR POSTED.

3/15/10-7/2/10

Moreland Rd., Lower Moreland Twp.

Utility Installation: CLOSED AND DETOURED between PA 232 & Pine Rd.  9 AM - 3 PM.  DETOUR POSTED.

3/15/10-7/2/10

Hanover St., Bor. of Pottstown

Mill & Pave: LANE RESTRICTIONS between Beech St. & Third St.  9 AM - 3 PM.

3/16/10

Township Line Rd., Limerick, Upper Providence twps.

Road Reconstruction: CLOSED & DETOURED between Linfield Trappe Rd. & Buckwalter Rd.  24-HOUR DETOUR.  DETOUR POSTED.

3/16/10-6/18/10

Susquehanna Rd., Abington Twp.

Line Stripping: LANE CLOSURES between Ft. Washington Rd. &  Old York Rd.  7 AM - 3 PM.

3/16/10-3/19/10

Fretz Rd., Lower Salford, Towamencin twps.

Road Reconstruction:  CLOSED & DETOURED between Wambold Rd. & Tomlinson Rd.   24-HOUR DETOUR.

3/19/10-5/7/10

Barren Hill Rd., Whitemarsh Twp.

Utility Installation: CLOSED & DETOURED between Harts Lane & Hector St.  9 AM - 3 PM.  DETOUR POSTED.

3/10/10-4/16/10

Allentown Rd., Towamencin Twp.

Road Reconstruction: CLOSED & DETOURED between Orvilla Rd. & Weikel Rd.  24-HOUR DETOUR.  DETOUR POSTED.

1/6/10-8/27/10

Bethlehem Pike, Springfield Twp.

Excavation: RIGHT LANE CLOSED between McCloskey Rd. & Whitemarsh Twp. line.  9 AM - 3 PM.

12/7/09-2/2/2011

Bethlehem Pike, Springfield Twp.

Excavation: RIGHT LANE CLOSED between Gordon Rd. & Windsor Rd.  9 AM - 3 PM.

12/7/09-2/2/2011

South Gulph Rd., Upper Merion Twp.

Ramp Construction: TRAFFIC PATTERN SHIFT between Henderson Rd. & Crooked Lane. 

12/3/09-6/2012

Stenton Ave., Whitemarsh Twp.

Bridge Rehabilitation: CLOSED & DETOURED between Joshua Rd. & Bethlehem Pike.  24-HOUR DETOUR.

11/18/09-5/2010

Spring Mount Rd., Lower Frederick Twp.

Bridge Replacement: CLOSED & DETOURED between Station Ave. & Schwenksville Rd.  24-HOUR DETOUR.  DETOUR POSTED.

11/4/09-10/2010

James Rd. Bridge, Upper Hanover Twp.

Bridge Replacement: CLOSED & DETOURED between PA 29 & Geryville Pike.  24-HOUR DETOUR.  DETOUR POSTED.

9/14/09-4/16/2010

*US 422 E & W, Upper Providence, Limerick twps.

Road Reconstruction:  REDUCED FROM TWO LANES TO ONE between PA 29 & Royersford Interchange.   EASTBOUND WEEKDAYS 10 AM - 5 AM; WESTBOUND 7 PM - 2 PM.

5/26/09-7/2010

Conshohocken Rd., Plymouth Twp.

Bridge Replacement: CLOSED & DETOURED between Fayette St./Butler Pike & Ridge Pike.  24-HOUR DETOUR.  DETOUR POSTED.

5/09-6/2011

Knapp Rd., Montgomery Twp.

Road Widening: REDUCED TO ONE LANE IN EACH DIRECTION between Witchwood Drive & US 202.  24-HOUR RESTRICTION.

2/16/09-12/2010

Salford Station Rd., Upper Salford, Lower Frederick twps.

Bridge Damage: CLOSED & DETOURED between Walnut Lane & Hendricks Rd.   DETOUR POSTED. 

12/18/08-Indef.

*US 202 N & S, Whitpain Twp.

Bridge Reconstruction: LANE RESTRICTIONS between Jolly Rd. & Cherry Rd.  24-HOUR RESTRICTIONS.

11/19/08-7/2010

Walton Rd., Plymouth Twp.

Bridge Reconstruction: LANE RESTRICTION between Germantown Pike & Township Line Rd.  24-HOUR RESTRICTIONS.

11/19/08-7/2010

*PA 309 South, Lower Gwynedd Twp.

Road Construction: POSSIBLE LANE CLOSURE between Highland Ave. & PA 63.  9 AM - 3 PM.

7/2/08-8/31/10

*PA 309 South, Lower Gwynedd, Upper Dublin twps.

Bridge/Road Construction: REDUCED TO ONE LANE between expressway on-ramp & Norristown Rd. Interchange.  24-Hour Restriction.

9/25/07-8/2010

Morwood Rd, Salford Twp.

Bridge Damage: CLOSED & DETOURED between PA 563 & Fretz Rd. 24 HOUR RESTRICTION.  DETOUR POSTED.

6/25/03-indef.

 

 (* DENOTES DELAYS ARE EXPECTED)

 

 

 

ROUTE 309 UPDATE

 